Tuesday, April 8th, 2003
We all went to Brian's today. There was a transportation fiasco again and after the fiasco and snack, we started at 4:00. Maybe I should correct that. I started at about 3:55 while everybody else snacked and Jamie and Brain argued over Brian's future laptop. Every now and then, I would talk to Tevis about the device. I drilled the new rope holes much closer to the drive shaft. At about 4:20, Tevis took the upper plate upstairs and I think he and Jamie worked on their clamp but considering they were loud, they may have been discussing other things.
At 4:30, Brian and I started work on the control box. Here's what we decided we needed:
- Safety On/Off, Circuit breaker
- Six terminal switch to make north clamp go in and out
- On/Off south end clamp deactivator
- Six terminal switch for lifter motor
- potentiometer for variable upper clamp mode
Then, time was getting short so we decided that I would build it over the coming one-week vacation while everybody else will be away.